Advantages of Belbien on Elevators
  • Installation does not involve a costly elevator company
  • Class A fire rating
  • Stain and solvent resistant
  • No Trees Cut Down
  • Lightweight (No change in elevator weight and balance)
  • Minimal Downtime – Most elevator jobs take one day
  • Minimal Smells
  • No Dust and No Mess
  • Belbien goes over existing laminate
  • Belbien goes over most wood panel systems
  • Save the panels – save landfill space
  • No need to remove handrail
  • Inlays
  • 70 to 90% less than the cost of traditional elevator renovations

All of this without sacrificing trees, quality or craftsmanship.

**Click Images for Larger View**
Location:
Wells Fargo Tower
Bloomington, MN
Element(s):
Elevator Cabs
Pattern(s):
W-336 / W-714AM
Location:
Doctors Professional Building
Edina, MN
Element(s):
Elevator Doors / Frames / Cabs
Pattern(s):
SW-17 / WA-387 / C-656
Location:
Wausau City Hall
Wausau, WI
Element(s):
Elevator Doors / Frames / Cabs
Pattern(s):
SW-25
Location:
Professional Office Building (Trizec Properties)
St. Louis, MO
Element(s):
Elevator Cabs

Pattern(s):
SW-33 / W-377
Location:
Minnesota Center Office
Bloomington, MN
Element(s):
Elevator Cabs
Pattern(s):
W-376 / W-360